The Project: Constitution Hill safety improvements
Client: DIER
Value: $7.9M
Construction Period: November 2008 - July 2009
Location: Constitution Hill, Midland Highway
The project included:
- Surface and subsurface drainage
- Stormwater works including major box culvert extension
- Supply and placement of pavement sub base,base material and bituminous surfacing
- Installation of tensioned wire rope safety barrier and W beam safety barrier including back to back rail with skid rail
- Supply and installation of rock filled gabions
- Modification to a property access and fencing.
